Pre-engineered steel buildings are constructions made of steel structures and fabricated and installed according to pre-specified architectural and technical drawings. The process of setting up a building consists of 3 main stages: Design, fabrication and erection at the site.
1. Low cost;
2. Take short time for all processes: Design - Production - Erection;
3. Quality is strictly controlled according to ISO 9001-2015;
4. Apply advanced technology and equipment in the entire project process;
5. Suitable for many types of industrial and civil construction such as: factories, warehouses, showrooms, workshops, offices, shopping centers, schools, hospitals, supermarkets...
Kumho Tire, phase 2-3-4 – Binh Duong
Sechang Project – Dong Nai
See more: Other Projects
Pre-engineered steel buildings are erected from the following interconnected components:
1. Main components: columns, beams, braces…
2. Auxiliary components: C or Z purlins, wall top struts, wall beams…
3. Roofing and wall panels…
4. Other accessories
Seogwang Project – Dong Nai
The entire production of the main structure and sub-structure including: cutting, punching, drilling, welding and forming is completed at the factory before being delivered to the construction site. After that, the components will be assembled and linked together by bolts. This saves costs and reduces installation time.
Pre-engineered steel buildings are also very flexible in adding other structural accessories such as wall lights, exhaust fans, doors and windows, trusses, mezzanines, roofs, crane systems, insulation etc... based on the diverse requirements of customers.